



Hydropneumatic Bladder Pressure Tank
Pre-charged EPDM food-grade bladder tanks for booster pump systems. Reduces pump cycling, absorbs pressure fluctuations, and extends pump life. PN16 pressure rating. Food-grade EPDM inner bladder isolates water from the tank shell.
WRAS · ISO 9001 · TÜV · CE · ASME · PED|Nationwide PH delivery|Quote in 3 to 5 business days|1 business day response




Request a Quotation
Send us your requirements and we'll prepare a detailed quotation with pricing and scope of supply.
Related Products
Vertical Multistage Centrifugal Pump
CDL/CDLF series stainless steel pumps for building water supply, boiler feed, and industrial pressure boosting. 0.37kW to 200kW.
VFD Duplex Pump Control Panel
Intelligent pump control with Variable Frequency Drive, PLC automation, and 7" HMI touchscreen. Constant pressure, energy savings of 20-35%.
Complete Pump System Package
Matched water distribution package: duplex pumps + VFD control panel + hydropneumatic pressure tank + piping accessories — sized to your specifications.
Overview
Hydropneumatic pressure tanks are essential for any commercial water distribution system. The internal EPDM rubber bladder separates compressed air from water — as water is drawn from the tank, air pressure pushes it out at consistent pressure. This eliminates pump short-cycling (the rapid on/off switching that destroys motors), dampens pressure spikes from sudden valve closures, and provides a buffer of pressurized water for immediate demand. Without a pressure tank, pumps would cycle on/off every few seconds during variable demand — leading to premature motor failure and inconsistent water pressure. For commercial laundry operations, consistent water pressure directly impacts wash quality.
Key Features
Technical Specifications
| Capacity | 100L to 5,000L |
| Max Working Pressure | 10 bar / 16 bar (model dependent) |
| Bladder Material | EPDM (food-grade available) |
| Shell Material | Carbon steel (epoxy-coated) or SS304 |
| Temperature Range | 0°C to 99°C |
| Connection | Flanged bottom inlet (DN50 - DN150) |
| Pre-charge Pressure | Factory set (adjustable) |
| Orientation | Vertical or Horizontal |
Applications
Capacity Options & Lead Times
| Capacity | Pressure rating | Bladder material | Typical pump system pairing | Lead time |
|---|---|---|---|---|
| 100 L | PN10 | EPDM food-grade | Small commercial booster | 14-28 days |
| 300 L | PN10 or PN16 | EPDM food-grade | Small-mid commercial, single pump | 14-28 days |
| 500 L | PN16 | EPDM food-grade | Mid-size duplex booster (5.5 kW class) | 21-35 days |
| 1,000 L | PN16 | EPDM food-grade | Large duplex booster (11 kW class) | 21-35 days |
| 2,000 L | PN16 | EPDM food-grade | Industrial duplex/triplex booster | 30-45 days |
| 5,000 L+ | PN16 or PN25 | Custom | Utility-scale distribution | 45-75 days |
Almost always paired with a booster pump system and quoted as a bundle.
Who Typically Buys This
What Determines Your Quote
Every quote is engineered to your operating requirements. Pricing depends on:
- Configuration: capacity, flow rate, head pressure, motor size, voltage/phase, materials of construction
- Certification tier: WRAS-cert vs commercial-grade, ASME stamping, IP rating for panels
- Delivery region: nationwide (Metro Manila, Luzon, Visayas, Mindanao); freight varies by destination
- Installation scope: supply-only, supply + mechanical install, or full turn-key with commissioning
- Payment structure: milestone terms tailored to project timeline (typically 40/30/20/10 for engineered scopes; 70/30 for equipment supply)
- Tax status: 12% VAT applies to VAT-registered buyers; Zero-VAT available for eligible PEZA / SBMA locators and exporters
Formal written quote within 3 to 5 business days of complete spec confirmation. Response within 1 business day to every inquiry.
Frequently Asked Questions
Why does my booster system need a bladder tank?
The pre-charged bladder absorbs pressure fluctuations and stores a buffer of pressurized water, so your pumps cycle far less often. Fewer starts per hour means dramatically longer pump and motor life, lower energy use, and steadier water pressure at the fixtures. It is the cheapest insurance in the whole pump room.
Is the bladder safe for drinking water?
Yes. The inner bladder is food-grade EPDM, which fully isolates the stored water from the steel tank shell. The water only ever touches the EPDM membrane, making it suitable for potable water systems.
How do I size the bladder tank to my pumps?
Pairing follows pump class: a 5.5 kW class duplex booster typically takes a 500 L tank, an 11 kW class takes 1,000 L, and industrial triplex systems take 2,000 L and up. If you tell us your pump configuration (or buy the system as a bundle), we size it for you as part of the quotation.
What certifications come with the tank?
The tanks carry CE marking and are manufactured in accordance with the PED 2014/68/EU pressure equipment directive, with ASME-rated construction available for commercial and industrial applications. Because this is a pressure vessel, the paperwork matters as much as the steel: every shipment includes material test certificates for the shell and factory inspection reports confirming the tank passed pressure testing before dispatch. The food-grade EPDM bladder is documented as well, which supports potable water compliance if your project requires it. Consultants and building officials sometimes ask for specific certificate formats for pressure vessel registration or permit submittals, so raise this requirement early at the inquiry stage: the exact document package for your order is confirmed in the written quotation, and we respond to every inquiry within 1 business day so your submittal schedule is not left waiting.
What is the lead time for bladder tanks?
Smaller tanks of 100 L to 300 L run 14 to 28 days from down payment, mid-size tanks of 500 L to 1,000 L run 21 to 35 days, and 2,000 L industrial units run 30 to 45 days. Custom capacities of 5,000 L and above run 45 to 75 days because the shell and bladder are built to order rather than pulled from a standard line. These timelines include factory pressure testing and inspection, and the corresponding test reports ship together with the tank. Since bladder tanks are almost always ordered as part of a booster pump bundle, the practical schedule usually follows the pump system lead time, and we align the component deliveries so everything arrives on site together. The committed lead time for your exact tank configuration is always stated in the written quotation.
Do you install the tank or just deliver it?
Both options are available and quoted separately on the same quotation so you can compare the numbers directly. Supply-only means the tank is delivered to site with its documents while your contractor handles positioning, piping tie-in, and pre-charge adjustment, which suits projects where an MEP contractor is already mobilized. Supply-plus-installation means our team positions the tank, connects it to your pump system, sets the pre-charge pressure to match your pump cut-in settings, and verifies operation before handover. The pre-charge setting is the detail most often done wrong in self-installs (an incorrectly charged tank protects nothing), so if your team has not commissioned a bladder tank before, the installed option is worth the difference. Tell us which scope you prefer when you inquire and the quotation will show both figures within 3 to 5 business days.
Related Products in Pumping & Pressure Systems
Ready to Spec This In?
Send us your requirements (capacity, location, timeline, install scope) and we'll return a fully specced quotation with drawings, material certificates, and lead time within 3 to 5 business days.
Request a Quotesales@johob.com · +63 997 078 9953 (Viber)
Common inquiries we can answer today: sizing math, alternative product recommendations, delivery estimates, milestone payment structures, PhilGEPS or PEZA compliance paperwork.