Vertical multistage centrifugal pump — full view
Vertical multistage centrifugal pump
Stainless steel CDL-series pump installation

Vertical Multistage Centrifugal Pump, CDL / CDLF Series

SS304 stainless steel vertical multistage pumps for commercial water distribution, boiler feed, and industrial pressure boosting. VFD-compatible for energy-efficient variable-speed operation. Compact vertical footprint fits tight pump rooms. 0.37 kW to 200 kW motor range.

WRAS · ISO 9001 · TÜV · CE · ASME · PED|Nationwide PH delivery|Quote in 3 to 5 business days|1 business day response

CEISO 9001:2015ISO 14001

Overview

Our vertical multistage centrifugal pumps (CDL/CDLF series) are the workhorse of commercial water distribution. Built entirely from SS304 stainless steel with precision-balanced impellers, these pumps deliver high pressure in a compact vertical footprint. VFD-compatible for energy-efficient variable speed operation. Multiple impellers stacked vertically generate the high head pressure needed to distribute water from ground-level storage tanks to every floor and fixture in a commercial building. For commercial laundry operations, consistent water pressure is critical — pressure fluctuations cause poor wash results and machine errors.

Key Features

Full SS304 stainless steel wetted parts
Multiple impeller stages for high-pressure output
Compact vertical design — small installation footprint
VFD-compatible for variable speed operation
Mechanical shaft seal (silicon carbide/carbon)
Low vibration and noise operation
Energy-efficient hydraulic design
Easy maintenance — top-pull-out cartridge design

Technical Specifications

ModelCDL / CDLF Series
Flow Rate1 - 240 m³/hr
HeadUp to 300+ meters
Power0.37kW - 200kW (0.5HP - 268HP)
MaterialSS304 (CDLF: SS316)
Max Temperature120°C
Max Pressure2.5 MPa (25 bar)
Shaft SealMechanical seal (SiC/Carbon)
ConnectionFlanged (DN25 - DN150)
Motor ProtectionIP55, Class F insulation

Applications

Building water supply & pressure boosting
Commercial laundry water distribution
Boiler feed water systems
Industrial process water circulation
HVAC chilled/hot water systems
Reverse osmosis (RO) feed pumps
Fire suppression booster systems

Motor Sizing & Lead Times

MotorFlow rangeHead rangeTypical applicationLead time
0.37 kW1-3 m³/hr20-60 mSmall commercial booster, single-fixture zones21-35 days
2.2 kW4-10 m³/hr40-90 mSmall-mid commercial, 4-6 storey building21-35 days
5.5 kW10-20 m³/hr60-120 mMid-rise commercial, hotels, medium laundry21-35 days
11 kW (15 HP)25-40 m³/hr80-150 mLarge commercial, industrial laundry, mid-rise hospital21-35 days
22 kW40-70 m³/hr100-180 mHigh-rise residential / commercial, large process plant30-45 days
45 kW+70-150 m³/hr120-200 mIndustrial water distribution, high-rise 20+ floors30-60 days
90-200 kW150+ m³/hr150-250 mUtility-scale, district cooling, large industrial45-90 days

Configuration options: simplex (1 pump), duplex (2 pumps with auto-alternation), triplex (3 pumps with lead-lag-standby). VFD or fixed-speed. 220V 3-phase 60Hz or 380V 3-phase 60Hz.

Who Typically Buys This

Commercial building owners
Hospital and hotel facilities teams
Industrial laundries
Condominium property managers
Factory maintenance departments
MEP contractors

What Determines Your Quote

Every quote is engineered to your operating requirements. Pricing depends on:

  • Configuration: capacity, flow rate, head pressure, motor size, voltage/phase, materials of construction
  • Certification tier: WRAS-cert vs commercial-grade, ASME stamping, IP rating for panels
  • Delivery region: nationwide (Metro Manila, Luzon, Visayas, Mindanao); freight varies by destination
  • Installation scope: supply-only, supply + mechanical install, or full turn-key with commissioning
  • Payment structure: milestone terms tailored to project timeline (typically 40/30/20/10 for engineered scopes; 70/30 for equipment supply)
  • Tax status: 12% VAT applies to VAT-registered buyers; Zero-VAT available for eligible PEZA / SBMA locators and exporters

Formal written quote within 3 to 5 business days of complete spec confirmation. Response within 1 business day to every inquiry.

Frequently Asked Questions

How do I size a pump for my building?

Motor size follows from your required flow (how many fixtures or machines run at peak) and head (how high and far the water must travel). As a rule of thumb: a 4 to 6 storey commercial building runs a 2.2 kW class pump, mid-rise buildings and medium laundries run 5.5 kW, and large commercial or industrial operations run 11 kW and up. Send us your building profile and we return the exact sizing math with the quotation.

Should I get VFD or fixed-speed?

VFD (variable frequency drive) operation adjusts pump speed to actual demand, which cuts energy consumption 20 to 35% in typical commercial duty and dramatically reduces pressure fluctuation and pump wear. Fixed-speed costs less upfront and suits steady, predictable loads. For most commercial buildings with variable demand through the day, VFD pays for itself within 2 to 3 years of energy savings.

What is the standard lead time?

Common motor sizes from 0.37 kW to 11 kW run 21 to 35 days from down payment. Larger motors of 22 kW and up run 30 to 60 days, and utility-scale units of 90 kW and above run 45 to 90 days. Every pump ships with material test certificates and performance curves.

What warranty do the pumps carry?

Manufacturer warranty of 12 months on the complete pump and motor assembly, passed directly to you with the warranty certificate in the delivery documents. Extended warranty tiers are available on request and quoted with the system.

What certifications and documents come with each pump?

CDL and CDLF series pumps carry CE marking and are manufactured under ISO 9001:2015 quality management and ISO 14001 environmental management systems. Beyond the certifications themselves, every shipment includes material test certificates confirming the SS304 stainless steel wetted parts (SS316 for CDLF units) together with factory inspection reports issued before dispatch, covering hydraulic performance verification at the factory. Performance curves for your specific pump model and the warranty certificate are also part of the standard delivery documents, so your compliance folder is complete from day one without chasing paperwork afterward. If your project requires additional supporting documents for a permit application, a consultant review, or a client audit, mention it when you request pricing: the exact document list for your order is confirmed in the written quotation, and we respond to every inquiry within 1 business day.

Do you deliver pumps outside Metro Manila?

Yes. Delivery covers Metro Manila, all Luzon provinces, the Visayas, and Mindanao, with regular shipments to industrial and economic zones including SBMA, Clark, and PEZA estates, where we handle the gate pass coordination and delivery scheduling those locations typically require. Pumps are individually crated and secured for both inland trucking and inter-island transport, and each crate is checked against the packing list before dispatch so what arrives on site matches your purchase order exactly. Freight cost depends on pump size, order quantity, and delivery destination, so it is itemized as a separate line in the written quotation rather than buried in the unit price. Send your delivery address together with your inquiry and you receive a response within 1 business day, followed by a complete quotation covering equipment and freight within 3 to 5 business days.

Ready to Spec This In?

Send us your requirements (capacity, location, timeline, install scope) and we'll return a fully specced quotation with drawings, material certificates, and lead time within 3 to 5 business days.

Request a Quote

sales@johob.com · +63 997 078 9953 (Viber)

Common inquiries we can answer today: sizing math, alternative product recommendations, delivery estimates, milestone payment structures, PhilGEPS or PEZA compliance paperwork.