Products
Industrial Systems Supplier in the Philippines: Pumps, VFD Panels, and Steam Boilers
One quotation covering the pump set, the VFD control panel that drives it, and the steam plant behind it, delivered nationwide with local warranty.
What JOHOB Supplies as an Industrial Systems Supplier in the Philippines
JOHOB Hardware Trading is a Philippines-based industrial systems supplier serving commercial, industrial, and institutional buyers. We source from Philippine and China factories and deliver with local warranty and after-sales support, which is the practical difference between buying direct from an overseas factory and buying from a supplier who is still reachable when a pressure transducer drifts or a contactor fails in month seven.
Our scope covers eight categories, from pumping and pressure systems through water storage, electrical panels, steam and boiler systems, piping, material handling, industrial processing lines, and fire protection, with the full range on our product catalog and the buyer verticals on our industries we serve page. Most buyers reach us needing two or three of those at once: a booster set plus the VFD panel that drives it, or a steam boiler plus the condensate return and the pressure reducing station downstream of it. Quoting those as one package removes the interface risk that appears when pumps, panels, and steam equipment arrive from three unrelated vendors with three different warranty positions. Pricing is quote-based and we respond to RFQs within 1 business day.
Pumping and Pressure Systems: Booster, Transfer, and Submersible
Our pumping and pressure systems cover booster sets, transfer pumps, and submersible pumps, supplied either as bare pumps or as complete packaged systems with the controls, pressure vessel, and manifold already assembled. We source from established pump brands including Grundfos, DAB, and Speroni, and from CDL for Chinese engineered vertical multistage pumps. That two-tier sourcing is deliberate: where a specification names a European brand or a facilities team has standardised on one spare parts stock, we quote it directly, and where the specification is performance-based we quote CDL units against the same duty so the buyer compares landed cost against lead time. Duty selection starts from the actual demand, not from the pipe size already in the ground: fixture unit counts, simultaneous demand, static lift, and riser friction, which is the method in our guide on how to size a booster pump for a commercial building. Standard lead times run 21 to 35 days ex-stock and 45 to 90 days made-to-order, confirmed on the quotation so the construction schedule is built on a real date.
VFD and Control Panels for Pump and Process Loads
We supply VFD panels, soft starter and direct-on-line (SDE) panels, star-delta starters, and motor control centres (MCC), sourced from Chutian with Inovance variable frequency drives. The most common configuration we quote is the VFD duplex control panel for a booster set: two pumps under one controller, with lead-lag alternation so run hours distribute evenly across both units. Panels carry CE marking, the manufacturer operates under an ISO 9001 quality management system, and equipment is TUV SUD tested where a specification asks for third-party verification. Choosing between a VFD panel and a fixed-speed starter is a load-profile question, not a budget question: a load that runs at a genuinely constant duty most of the day gets less from variable speed than a load with a wide diurnal swing. Our VFD versus fixed-speed pumps guide sets out how to read your own demand curve before committing, because the wrong answer here is expensive twice: once in the panel and again in the motor.
Steam and Boiler Systems: Boilers, Hot Water, and Condensate Return
Our steam and boiler systems scope covers the industrial steam boiler, hot water systems, and condensate handling, together with the accessories that make a steam loop actually work: steam to water heat exchangers, the steam pressure reducing station, and steam traps. Where a pressure vessel is involved, ASME applies to the supplied equipment where applicable. We treat steam as a loop rather than a boiler purchase: a commercial laundry, a food processing line, or a hospital sterilisation load each pull steam at different rates and pressures, and the boiler is only correctly sized once the downstream demand, the reduction stages, and the condensate returned to the feedwater tank are accounted for. Undersized condensate return is the most common reason a correctly sized boiler still underperforms, because feedwater arriving cold forces the burner to work against a deficit that never appears on the nameplate. When we quote, we ask for the connected steam loads, the required pressure at each point of use, and the operating hours per day, and we quote the loop as one scope so responsibility sits in one place.
Nationwide Coverage Including PEZA, SBMA, and Clark Locators
We deliver nationwide across the Philippines: NCR, the rest of Luzon, Visayas, and Mindanao, including locators inside PEZA zones, SBMA, and Clark. Zone deliveries carry paperwork that ordinary commercial deliveries do not, and getting it wrong costs the buyer more in time than the equipment discount was ever worth. VAT-registered buyers pay 12 percent VAT on our quotations, while PEZA and SBMA locators and exporters are quoted at zero-VAT, so the figure on our quotation reflects your actual registration status rather than a headline price you argue about at invoicing. For provincial and island deliveries we confirm the delivery point, access constraints, and offloading arrangement before the quotation is issued, because a booster skid or packaged boiler that cannot reach its plant room is a delivery that has not happened. Where a project needs modular water tanks alongside the pump or steam scope, those are supplied under our TankSmith sister brand, with FRP modular water tanks covered in depth on our FRP water tank supplier Philippines page, and commercial solar EPC work handled by our Philvolt sister brand.
Certifications, Sourcing, and How Quoting Works
Certification on the equipment we supply depends on the equipment type: CE marking on electrical panels and material handling units, ISO 9001 quality management systems at manufacturer level, TUV SUD testing where a specification requires third-party verification, ASME on pressure vessels where applicable, WRAS-certified panels on water storage tanks, and IPAF for scissor lifts. We name these against the specific product rather than as a blanket company claim, because a procurement officer comparing bids needs to know which certificate covers which line item. Sourcing is equally explicit for an industrial systems supplier: Grundfos, DAB, and Speroni for established pump brands, CDL for engineered vertical multistage pumps, Chutian for control panels built around Inovance VFDs, and partner OEM factories for the modular tanks delivered under TankSmith. Pricing is quote-based. What we commit to is response time: we come back on RFQs within 1 business day. A useful RFQ gives us the duty or capacity required, the voltage and phase available at site, the delivery address and registration status, and your required on-site date so we can tell you honestly which lead time band applies; the full sequencing picture is in our pump system project timeline guide.
Frequently Asked Questions
Can one supplier provide the pumps, the VFD panel, and the boiler for the same project?
Yes. JOHOB Hardware Trading supplies pumping and pressure systems (booster, transfer, submersible), electrical panels (VFD, SDE, star-delta, MCC), and steam and boiler systems (steam boilers, hot water, condensate) from one quotation. Packaging them together removes the interface risk that appears when a pump set, its controller, and the steam equipment arrive from three unrelated vendors with three separate warranty positions. Tell us the duty point, the available voltage and phase, and the connected steam loads, and we quote the whole scope with one lead time schedule and one after-sales contact.
How much do your pumps, VFD panels, and boilers cost?
Pricing is quote-based and we do not publish prices. Duty point, materials, panel configuration, certification requirements, and delivery point change the figure too much for a list price to be useful on a commercial or industrial project. We respond to RFQs within 1 business day. Buyers who are VAT-registered are quoted with 12 percent VAT applied, while PEZA and SBMA locators and exporters are quoted at zero-VAT, so include your registration status in the enquiry and the quotation comes back correctly rated the first time.
What are your lead times for pump sets, control panels, and steam boilers?
Standard lead times are 21 to 35 days for ex-stock items and 45 to 90 days for made-to-order configurations. Which band applies depends on the equipment: a standard booster set or a standard panel configuration usually falls in the ex-stock band, while a panel built to a specific control philosophy or a boiler matched to an unusual steam load falls in the made-to-order band. We state the applicable band on the quotation itself so your construction programme is built on a real date rather than an optimistic one.
Do you deliver to PEZA, SBMA, and Clark locators, and outside Metro Manila?
Yes. Coverage is nationwide across the Philippines: NCR, the rest of Luzon, Visayas, and Mindanao, including PEZA, SBMA, and Clark locators. PEZA and SBMA locators and exporters are quoted at zero-VAT rather than the standard 12 percent VAT that applies to VAT-registered commercial buyers. For provincial and island deliveries we confirm the delivery point, site access, and offloading arrangement before issuing the quotation, because a packaged boiler or booster skid that cannot physically reach its plant room is not a completed delivery.
Which pump and VFD brands do you supply, and what certifications do they carry?
For pumps we supply established brands including Grundfos, DAB, and Speroni, plus CDL for Chinese engineered vertical multistage units. Control panels are sourced from Chutian and built around Inovance variable frequency drives. Certification depends on the equipment: CE marking on electrical panels and material handling units, ISO 9001 quality management systems at manufacturer level, TUV SUD testing where a specification requires third-party verification, and ASME on pressure vessels where applicable. We can supply the certificate covering each specific line item on request.
Should I specify a VFD panel or a fixed-speed starter for my booster set?
It depends on your load profile, not your budget. A load that runs at a genuinely constant duty for most of the day gains less from variable speed than a load with a wide daily swing, such as a hotel or mid-rise residential riser where overnight demand drops close to zero. Our VFD versus fixed-speed pumps guide sets out how to read your own demand curve before you commit. We supply both: VFD duplex panels with lead-lag alternation, and SDE, star-delta, and MCC panels where fixed speed is the right answer.
Related Pages
- Pumping and Pressure Systems
- VFD Duplex Control Panel
- Steam and Boiler Systems
- One Stop Shop Industrial Equipment Supplier
- Guide: VFD vs Fixed-Speed Pumps
Reviewed: August 2026
Talk to Us About Your Project
Send us your requirements and we'll return a written recommendation within 3 to 5 business days. Response within 1 business day.
Request a Quotesales@johob.com · +63 997 078 9953 (Viber)