What a Grundfos transfer pump costs in the Philippines right now
If you are searching for a Grundfos transfer pump price in the Philippines, you have probably already found a few online listings and noticed how wide the spread is. As of August 2026, publicly listed retail prices on Philippine online pump retailers include a SCALA2 domestic booster at around PHP 55,000 and CR-series vertical multistage units from about PHP 86,000 to PHP 143,000.
The same listings show CRE variable-speed units from about PHP 148,000 up to about PHP 303,000 (CRE 15-4 DIN flange), an SBA 3-35A submersible at around PHP 36,000, and a PM-2 pressure manager at around PHP 14,500. Those are third-party retail listings for a single bare pump. They are not JOHOB quotations, and they do not include the control panel, the pressure tank, the suction and discharge fittings, delivery to site, commissioning, or the local warranty. JOHOB prices on a quotation basis rather than a published list, because a transfer pump that is correct for a 12-storey residential tower is the wrong pump for a 3,000 square metre commercial laundry, and quoting a SKU without the duty point behind it is how buyers end up with a unit that cavitates or short-cycles. Send us the flow rate, the total head, and the storage arrangement and you get a costed configuration back, not a catalogue page.
Transfer pump or booster pump: make sure you are pricing the right machine
Half of the Grundfos price enquiries we receive are for the wrong category, so it is worth ten seconds of clarification before you compare numbers. A transfer pump moves water from one holding point to another, typically from an underground cistern up to a rooftop or overhead tank, and it is sized on flow and static lift. It runs intermittently, usually on level control, and it does not need to hold a set pressure. A booster pump takes water from storage and delivers it into the building distribution at a controlled pressure, and it is sized on peak simultaneous demand plus residual pressure at the highest and furthest fixture. It runs constantly and modulates. The two jobs produce very different bills of materials. A transfer duty often lands on a straightforward end-suction or vertical multistage centrifugal pump with a simple starter and float or probe control. A boosting duty typically needs a multi-pump set from our range of commercial booster pumps for buildings and industrial facilities, a hydropneumatic pressure tank, and a VFD panel to hold pressure without hunting. That is why one quotation can be a fraction of the other for the same building. JOHOB supplies both, sourced from Grundfos, DAB, Speroni, and CDL, along with the VFD, star-delta, SDE, and MCC panels that go around them. Tell us which duty you are solving and we will price only what that duty needs.
The seven line items inside a real transfer pump quotation
The gap between a retail sticker and a delivered, working transfer pump system is usually made up of the same seven items, and understanding them is the fastest way to compare two quotations fairly. First, the pump itself, selected against your duty point rather than picked off a shelf. Second, the control panel: a simple direct-on-line or star-delta starter for a basic transfer duty, or VFD duplex pump control panels with Inovance drives (supplied through Chutian) where soft starting, energy savings, or duplex alternation matter. Third, level control, whether float switches, electrode probes, or ultrasonic, since a transfer pump running dry is the most common way a good pump dies early. Fourth, the suction and discharge accessories: stainless steel flexible hoses, ball or gate valves, check valves, and gauges. Fifth, a hydropneumatic pressure tank where the transfer set also feeds a pressurised leg. Sixth, delivery to site, which is a real number in the Philippines and varies substantially between an NCR delivery and a Mindanao or PEZA-zone delivery. Seventh, commissioning and handover, plus the local warranty and after-sales cover that makes the difference between a two-week fix and a two-month wait for parts. A quotation that shows only item one is not cheaper. It is incomplete.
VAT, PEZA, and SBMA: the tax line changes your number by 12 percent
Before you compare a Grundfos transfer pump price across suppliers, check whether you are looking at a VAT-inclusive or VAT-exclusive figure, because in the Philippines that single detail moves the total by 12 percent. For VAT-registered buyers, 12 percent VAT applies on top of the equipment and services value in the normal way, and you claim it as input VAT in the usual course. For PEZA and SBMA locators, and for registered exporters, zero-rated VAT treatment applies, so the same configuration lands materially lower on your purchase order. We handle both routes as a matter of course, since our coverage includes PEZA, SBMA, and Clark ecozones alongside standard NCR, Luzon, Visayas, and Mindanao deliveries. What we need from you to apply zero-rating correctly is your registration status and the supporting documentation up front, not after the invoice is cut, because correcting the tax treatment retroactively is administratively painful for both sides. When you request a quotation, state whether you are VAT-registered, a PEZA or SBMA locator, or an exporter, and the quotation comes back with the correct tax line already applied. Retail listings you find online are typically quoted on a VAT-inclusive consumer basis, which is one more reason those numbers are not directly comparable to a commercial supply quotation.
Lead time: 21 to 35 days ex-stock, 45 to 90 days made-to-order
Price is only half the procurement question. The other half is when the pump lands on your site, and this is where sourcing route matters more than brand. JOHOB works to two standard windows. Ex-stock configurations, meaning units and panels we can pull from existing stock or from a supplier's held inventory, run 21 to 35 days from confirmed order to delivery. Made-to-order configurations, meaning a specific duty point, a non-standard material specification, or a custom-built control panel, run 45 to 90 days. The second window is longer because it includes factory build time at the source plant plus sea freight, and compressing it usually means either changing the specification or paying for air freight, both of which we will price honestly rather than promise around. Where the windows land in a real construction programme is mapped in our pump system project timeline guide. Where a project has a hard commissioning date, tell us the date at RFQ stage rather than at PO stage. In most cases there is a stocked alternative that meets the same duty point within tolerance and lands inside the shorter window, and we would rather offer you that trade-off openly than quote an aggressive date we cannot hold. We respond to RFQs within one business day, so scoping the lead-time question costs you a day, not a week.
When Grundfos is not the right answer: DAB, Speroni, and CDL alternatives
Grundfos is a genuinely good specification and there are projects where nothing else should be considered, particularly where a consultant has named the brand, where the facility already standardises on Grundfos spares, or where the duty point sits in a range the CR and CRE families cover unusually well. There are also projects where the brand premium buys you nothing you will use. If your transfer duty is intermittent, the head is modest, and there is no requirement for variable speed control, a DAB or Speroni unit will often meet the same duty at a lower landed cost. Where the duty calls for a vertical multistage unit but the budget is fixed, CDL engineered vertical multistage pumps cover a broad slice of the same hydraulic envelope. Our position is straightforward: we source across Grundfos, DAB, Speroni, and CDL, so we have no incentive to push you toward one badge; the control-method half of the decision is covered in VFD versus fixed speed pumps. The equipment we supply is backed by manufacturer ISO 9001 quality management systems, with TUV SUD testing and CE marking on the electrical and control content where applicable. Ask for the comparison and we will quote two or three options against the same duty point so you can see the actual delta rather than guess at it.
How to get a Grundfos transfer pump quotation from JOHOB
To get a Grundfos transfer pump price that means something, send us five things. One, the required flow rate, in litres per second or gallons per minute, either is fine and our reference on GPM to LPS pump conversion for Philippine projects handles the arithmetic. Two, the total head, or if you do not have it, the vertical lift from cistern water level to the discharge point plus the approximate pipe run and size. Three, the storage arrangement: underground cistern to roof tank, ground tank to elevated tank, or something else. Four, the power supply available at the pump room, including phase and voltage. Five, your buyer status for tax purposes, meaning VAT-registered, PEZA or SBMA locator, or exporter. If you do not have all five, send what you have. Missing head or flow is the normal starting condition and we will work it out from the building profile using the method in how to size a booster pump for a commercial building. We respond to RFQs within one business day with a costed configuration covering the pump, the control panel, the level control, the accessories, delivery, and the applicable lead time window, or the whole scope as one of our complete pump system packages. We supply nationwide across NCR, Luzon, Visayas, and Mindanao, including PEZA, SBMA, and Clark locators, with our provincial coverage as a pump supplier for Pampanga and Clark, with local warranty and after-sales support on the equipment we deliver.
Frequently Asked Questions
How much does a Grundfos transfer pump cost in the Philippines?
Publicly listed retail prices on Philippine online pump retailers as of August 2026 range from about PHP 36,000 for an SBA 3-35A submersible and about PHP 55,000 for a SCALA2 booster, up through roughly PHP 86,000 to PHP 143,000 for CR-series vertical multistage units and about PHP 148,000 to PHP 303,000 for CRE variable-speed units. Those figures are for a bare pump only. A delivered transfer pump system also includes the control panel, level control, valves and flexible hoses, delivery, and commissioning. JOHOB quotes per configuration against your actual duty point.
Why does JOHOB not publish a Grundfos price list?
Because a pump model number without a duty point behind it is not a price, it is a guess. The same building can need a PHP 90,000 unit or a PHP 300,000 unit depending on flow, total head, whether variable speed control is required, and whether the set runs simplex or duplex. Publishing a list would encourage buyers to order on model number alone, which is how facilities end up with pumps that cavitate, short-cycle, or fail early. We price per configuration and respond to RFQs within one business day.
Is the 12 percent VAT included in your pump quotations?
It depends on your buyer status, and the quotation states it explicitly. For VAT-registered buyers, 12 percent VAT applies on top of the equipment and services value. For PEZA and SBMA locators and for registered exporters, zero-rated VAT treatment applies, which removes that 12 percent from your purchase order. Tell us your registration status and provide the supporting documentation at RFQ stage rather than after invoicing, so the correct tax treatment is applied from the start. We supply into PEZA, SBMA, and Clark zones as standard.
How long is delivery for a Grundfos transfer pump in the Philippines?
JOHOB works to two standard windows. Ex-stock configurations run 21 to 35 days from confirmed order to delivery. Made-to-order configurations, meaning a specific duty point, non-standard materials, or a custom-built control panel, run 45 to 90 days, since that window includes factory build time plus sea freight. If your project has a fixed commissioning date, say so at RFQ stage. There is often a stocked alternative meeting the same duty point that lands inside the shorter window, and we would rather offer that trade-off than quote a date we cannot hold.
What is the difference between a transfer pump and a booster pump?
A transfer pump moves water between holding points, typically from an underground cistern to a rooftop or overhead tank, and is sized on flow and static lift. It runs intermittently on level control and does not hold a set pressure. A booster pump takes water from storage and delivers it into the building distribution at controlled pressure, sized on peak simultaneous demand plus residual pressure at the highest and furthest fixture. Boosting duties usually need a multi-pump set, a hydropneumatic pressure tank, and a VFD panel, which is why the two quotations differ substantially.
Do you deliver and support transfer pumps outside Metro Manila?
Yes. JOHOB supplies nationwide across NCR, Luzon, Visayas, and Mindanao, including PEZA, SBMA, and Clark locators. Delivery cost is a real line item on the quotation and varies by destination, so it is shown separately rather than buried in the equipment price. Equipment we supply carries local warranty and after-sales support, which is the practical reason to buy through a Philippine supplier rather than direct import: when a drive or a seal fails, the replacement path is local rather than a multi-week international parts request.
Related Pages
- Commercial Booster Pumps
- Guide: Grundfos vs DAB Booster Pump Comparison
- Complete Pump System Package
- 3HP Submersible Pump for Deep Wells
- Guide: How to Size a Booster Pump
Reviewed: August 2026
Talk to Us About Your Project
Send us your requirements and we'll return a written recommendation within 3 to 5 business days. Response within 1 business day.
Request a Quotesales@johob.com · +63 997 078 9953 (Viber)