Industrial Equipment Supplier
Beverage Process Equipment Services for Philippine Processing Plants
JOHOB supplies beverage process equipment nationwide in the Philippines: pumps, boilers, electrical panels, piping from ISO 9001 certified partner factories.
JOHOB Hardware Trading supplies beverage process equipment to Philippine processing plants nationwide: pumping and pressure systems, electrical control panels, steam and boiler systems, piping and flow accessories, and water storage support through TankSmith. Equipment is sourced through ISO 9001 certified partner factories, CE marked where applicable, with RFQ response within 1 business day.
Pumping and Pressure Systems for Beverage Production Lines
Beverage processing lines need consistent water pressure and reliable fluid transfer at every stage, from intake through filling. JOHOB supplies booster pumps for production line pressure, transfer pumps for moving product and CIP (clean-in-place) water between stages, and submersible pumps for sump and drainage duty. For lines that run multiple pumps or need backup capacity, we pair pumps with VFD duplex panels so a second pump and controller can take over automatically if the lead unit faults, reducing unplanned downtime on a running line. All pumping equipment is sourced through an ISO 9001 certified partner factory, and electrical components carry CE marking. Standard lead time is 21 to 35 days for ex-stock units and 45 to 90 days for made-to-order configurations, with a response to RFQs within 1 business day. We deliver nationwide, covering NCR, Luzon, Visayas, and Mindanao, including PEZA, SBMA, and Clark locators. Pricing is quote-based: VAT-registered buyers pay the standard 12% VAT, while PEZA and SBMA locators and exporters qualify for zero-VAT treatment. For beverage plants weighing pump sizing or redundancy requirements, our team reviews flow rate, head pressure, and duty cycle before quoting, so the panel and pump pairing matches the actual production line rather than a generic catalog spec.
Electrical Control Panels for Beverage Processing Equipment
Pumps, boilers, and process equipment on a beverage line are only as reliable as the panels controlling them. JOHOB supplies VFD panels for variable-speed pump and motor control, star-delta panels for direct-on-line motor starting where variable speed is not needed, SDE panels, and MCC (motor control center) panels for plants running multiple motor loads from one point of control. All panels carry CE marking and are built using components sourced through an ISO 9001 certified partner factory. Panels are quoted against the specific motor loads, voltage, and control logic of the beverage line, not sold as fixed configurations, so pricing is quote-based rather than published. VAT-registered buyers are charged the standard 12% VAT; PEZA and SBMA-registered locators and exporters are zero-VAT. Lead times follow the same schedule as the rest of our equipment: 21 to 35 days ex-stock, 45 to 90 days for made-to-order panel builds, with an RFQ response within 1 business day. We supply and support panels nationwide, including PEZA, SBMA, and Clark zones, so a beverage plant running in an economic zone gets the same panel specification and after-sales support as one outside it. If a plant is replacing an aging panel rather than building a new line, send us the existing panel's motor schedule and we will quote a like-for-like or upgraded replacement.
Steam, Boiler, and Process Heat Equipment
Many beverage processing steps, pasteurization, bottle or can washing, and clean-in-place (CIP) cycles, run on steam or hot water rather than electric heat. JOHOB supplies steam boilers, hot water systems, and condensate recovery equipment sized to a plant's process heat load. Pressure vessel components meet ASME requirements where applicable, and units are TUV SUD tested before they leave the partner factory. Equipment is sourced through an ISO 9001 certified partner factory, the same sourcing standard applied across our pumping, electrical, and piping lines, so a beverage plant buying boiler and pump equipment together gets one certification standard across the order instead of mixed sourcing. As with the rest of our catalog, boiler and process heat equipment is quote-based: we size the unit to your steam or hot water demand before quoting, rather than publishing a flat price list. Standard lead time is 21 to 35 days ex-stock or 45 to 90 days for made-to-order boiler configurations, and we respond to RFQs within 1 business day. Delivery and after-sales support cover NCR, Luzon, Visayas, Mindanao, and PEZA, SBMA, and Clark economic zones.
Piping, Fittings, and Flow Accessories for Beverage Lines
Moving product and process water between tanks, pumps, and boilers reliably depends on the piping and fittings connecting them. JOHOB supplies stainless steel (SS) flexible hose for vibration-isolated connections at pumps and boilers, along with ball valves and gate valves for line isolation and flow control across a beverage processing line. These components are sourced through the same ISO 9001 certified partner factory standard as our pumping and electrical equipment, so a plant ordering pumps, panels, and piping together works with one supplier and one after-sales contact instead of coordinating separate vendors. Pricing is quote-based and sized against your line's pipe diameter, pressure rating, and run length. Lead times match the rest of our catalog: 21 to 35 days ex-stock for standard valve and hose sizes, 45 to 90 days for made-to-order configurations, with RFQ responses within 1 business day. We deliver nationwide, including PEZA, SBMA, and Clark locators, with zero-VAT treatment available to qualifying exporters and economic zone registrants.
Water Storage Support Through TankSmith
Beverage processing plants need process water, CIP water, or fire reserve capacity staged close to the line, and that storage is supplied through our sister brand, TankSmith (tanksmith.com). TankSmith handles modular water tanks in FRP, GRP, HDG, and stainless steel, built for turnkey installation rather than site-poured construction. Tank panels carry WRAS certification, relevant for process and potable water contact in a beverage plant. TankSmith coordinates directly with JOHOB on projects where pumping, electrical control, and storage are quoted as one package, so a beverage plant does not have to separately manage a tank supplier and an equipment supplier for the same line. As with JOHOB equipment, TankSmith pricing is quote-based and sized to your required storage volume and site constraints. Lead times and delivery coverage (NCR, Luzon, Visayas, Mindanao, PEZA, SBMA, Clark) follow the same nationwide footprint as JOHOB's own equipment lines, so a combined pump-and-tank quote arrives on one schedule rather than two.
Certifications, Lead Times, and Nationwide Coverage
Equipment supplied for beverage processing plants carries certification appropriate to the component: CE marking on electrical panels and material handling equipment, ASME compliance on pressure vessel components where applicable, TUV SUD testing, WRAS certification on tank panels, and IPAF certification on scissor lifts where material handling is part of the scope. All equipment is sourced through an ISO 9001 certified partner factory, meaning the manufacturer operates under an ISO 9001 quality management system. Standard lead times are 21 to 35 days for ex-stock items and 45 to 90 days for made-to-order configurations. We respond to every RFQ within 1 business day. Coverage is nationwide: NCR, Luzon, Visayas, and Mindanao, including PEZA, SBMA, and Clark Freeport locators. Pricing across every category above is quote-based, since beverage plant specifications vary by production volume and line layout. VAT-registered buyers are charged the standard 12% VAT; PEZA and SBMA-registered locators and exporters qualify for zero-VAT treatment on qualifying transactions.
Frequently Asked Questions
What equipment does JOHOB supply for beverage processing plants in the Philippines?
JOHOB supplies pumping and pressure systems (booster, transfer, and submersible pumps with VFD duplex panels), electrical control panels (VFD, SDE, star-delta, and MCC), steam boilers and process heat equipment, and piping and flow accessories (SS flexible hose, ball and gate valves) for beverage processing lines. Water storage, including FRP, GRP, HDG, and stainless steel modular tanks, is supplied through our sister brand TankSmith. All equipment is sourced through an ISO 9001 certified partner factory and delivered nationwide across NCR, Luzon, Visayas, Mindanao, and PEZA, SBMA, and Clark economic zones.
Do you supply water storage tanks for beverage plants?
Yes, through our sister brand TankSmith (tanksmith.com), which supplies modular water tanks in FRP, GRP, HDG, and stainless steel for process water, CIP water, or fire reserve storage. Tank panels carry WRAS certification. TankSmith and JOHOB coordinate on projects where pumping, electrical control, and storage are quoted together, so a beverage plant can get pumps, panels, and tanks on one quote and one delivery schedule instead of managing separate suppliers.
What certifications do your beverage process equipment carry?
Certifications depend on the equipment category: CE marking applies to electrical panels and material handling equipment, ASME compliance applies to pressure vessel components where applicable, boiler units are TUV SUD tested, tank panels carry WRAS certification, and scissor lifts carry IPAF certification. Across all categories, equipment is sourced through an ISO 9001 certified partner factory, meaning the manufacturer operates under an ISO 9001 quality management system. We do not hold PCAB accreditation and do not represent ourselves as PCAB-licensed.
What are your lead times for beverage process equipment?
Standard lead time is 21 to 35 days for ex-stock items and 45 to 90 days for made-to-order configurations, such as custom panel builds or sized boiler units. We respond to every RFQ within 1 business day. Because pricing and lead time both depend on the specific pump, panel, or boiler specification your line needs, we confirm an exact delivery date at quotation rather than publishing a fixed timeline for every product.
Do you serve PEZA or SBMA-registered beverage manufacturers?
Yes. We deliver nationwide, including PEZA, SBMA, and Clark Freeport locators, and both PEZA and SBMA-registered locators and exporters qualify for zero-VAT treatment on qualifying purchases, versus the standard 12% VAT for VAT-registered buyers outside those zones. Lead times and after-sales support for economic zone buyers follow the same nationwide schedule as equipment delivered to NCR, Luzon, Visayas, or Mindanao.
Related Pages
- Industrial Equipment Trading, Distribution and Engineering Services in the Philippines
- Vendor Laundry Machines Supplier: Infrastructure for Commercial Laundry Operations in the Philippines
- How Industrial Equipment Is Priced in the Philippines
- Hardware, Plumbing and Heating Equipment Wholesaler in the Philippines
- Industrial Equipment Price in the Philippines: What Drives the Cost
- Trusted Industrial Equipment Supplier for Factories Across the Philippines
Found this useful? Add Johob as a Preferred Source on Google so our supply guides show up first next time you search.
Talk to Us About Your Project
Send us your requirements and we'll return a written recommendation within 3 to 5 business days. Response within 1 business day.
Request a Quotesales@johob.com · +63 997 078 9953 (Viber)